PAJ GPS Easy Finder 4G – GPS Tracker for Kids, Seniors/Elderly & Loved Ones – Real-Time Location Tracker Device, SOS/Emergency Button, Voice Messages, Up to 14 Days Battery – Subscription Required
$39.99
Price: $39.99
(as of Feb 01, 2026 17:45:28 UTC – Details)
Product description
Worldwide Tracking
With PAJ GPS' trackers you will be able to enjoy tracking in more than 100 countries worldwide thanks to, among other things, the innovative 4G LTE technology.
Greater net coverage thanks to 2G + 4G network
The 2G Network will soon no longer be available and start to disappear country by country (some like Switzerland have already done so)!
Therefore, whoever owns or acquires a 2G GPS tracker now, must know that might not be useful anymore in the near future.
For this reason, our GPS trackers can use both 2G and 4G networks.
Opt for the 4G network and a long-term security system. Add PAJ GPS EASY Finder 4G tracker to your shopping cart!
PAJ GPS EASY Finder 4G – Highlights
Large SOS button + Voice Message FunctionSmall and lightPrecise location (approx. 5 meters)
Dimensions Height: 3.07 in Length: 1.14 in Width: 1.54 in Weight: 3.5 oz
Scope of delivery
PAJ GPS EASY Finder 4GCharger – Wallplug adapter and USB cableBag (incl. lanyard)M2M SIM card (already in your Finder)PAJ GPS FINDER Portal (subscription required)
Battery life
The battery lasts for around 7 days with an active tracking time of around 1h / day and up to 10 days in standby mode*!
*Standby mode
Our intelligent energy-saving mode will set the tracking device to standby mode whenever it is not moving. This will allow extending the battery life and will NOT deactivate alarms and other functions during this time.
Online Tracking Advantages
Explore our subscription options and choose the one that best suits your needs.
Basic plan:
Monthly: $13/monthAnnual: $7.5/month ($90 per year)Biennial: $5.5/month ($132 every 2 years)
Premium Plan:
Six-monthly: $11/month ($66 every 6 months)Annual: $8.5/month ($102 per year)Biennial: $6.5/month ($156 every 2 years)
The basic plan includes live tracking, access to the FINDER portal, all alarms and features, and 3 days of tracking history. The Premium plan offers: 365 days of tracking history, satellite, 3D, and outdoor maps, 24/7 priority support, and a device lifetime commitment as long as the tracker is in use. Ideal for those who want comprehensive control and protection.
Route information
Visualise travelled routes of the last 365 days. You will be able to analyse the information of each one of the route points, including:
Date and timeSpeedLocation
Geozone
Set a predefined geo-fence or “safe area” around your tracking device and as soon as your EASY FINDER 4G enters or exits this area, a notification will be sent to your email or to your mobile APP.
Live Tracking
Track your device in real-time. It's location will be updated every 30 seconds (even sooner if the tracker is changing direction)
Voice Message
The PAJ GPS tracker’s Voice Function lets users easily drop voice messages between the device and the PAJ Portal app user, ensuring quick communication for the elderly or kids when they need assistance or to stay connected.
SOS Alert
The SOS emergency button will send a notification immediately after pressing it.
You will be able to decide who will receive the emergency notification: easily add or change the addressee from our FINDER Portal settings
Speed alert
You will be able to define a maximum speed and activate this alarm so that, everytime your tracker exceeds it, an alarm is sent via mail or app. You must set a maximum speed of at least 10 km/h.
Battery Alert
If the battery life drops below approx. 20%, an alert is sent with this information. In addition, the battery status is displayed online on the portal or the app at all times.
Voice Message
SOS Alert
Speed alert
Battery Alert
Add to Cart
Add to Cart
Add to Cart
Add to Cart
Customer Reviews
4.3 out of 5 stars 4,418
4.3 out of 5 stars 4,418
4.3 out of 5 stars 4,418
4.2 out of 5 stars 874
Price
$39.99$39.99 $44.99$44.99 $29.99$29.99 $39.99$39.99
Battery
Approx. 10 days/ Daily tracking: approx 7 days – Battery 3,7 V 3000 mAh Li-ion Approx. 20 days with 1 hour tracking per day. Approx. 40 days in stand-by mode. Battery: Li-Ion 5.000 mAh Approx. 5 days – Battery: Li-Ion 1500 mAh Approx. 20 days – in standby approx. 40 days – Battery: Li-Ion 5,000 mAh
Dimensions
3.1 x 1.5 x 1.1 in 4.2 x 2.5 x 0.9 in 2.1 x 1.2 x 0.8 in 3.1 x 2.1 x 0.8 in
Weight
3.5 oz 6.0 oz 1.4 oz 9.9 oz
Alarms and notifications
Motion / vibration alarm SOS alarm SOS alarm Radius alarm Speed alarm Battery alarm Motion/vibration alarm Security Zone alarm SOS alarm Speed alert Connection failure alarm Shock/vibration alert, Geofence alert, Speed alert, Battery alert Motion/vibration alarm Security zone alarm Speed alert Battery alarm
Uses and applications
E-scooters, motorcycles, scooters, bicycles, bees/beekeepers, horses, children, elderly people, containers, wood, garden tools, instruments, suitcases E-scooters, motorcycles, scooters, bicycles, bees/beekeepers, horses, children, elderly people, containers, wood, garden tools, instruments, suitcases Children, Senior citizens, suitcases/bags, Instruments Cars, motorcycles, scooters, suitcases/bags, bicycles, e-scooters, e-bikes, garden tools, instruments, bees/beekeepers, horses, containers, wood, children, seniors
NO DISTANCE LIMITATION: PAJ’s GPS tracker device works without distance limitations, offering continuous monitoring of your loved ones no matter where they are. Perfect for families, especially for tracking children, elderly members, or even vehicles when needed.
SAFETY FIRST: The PAJ GPS finder has a voice message function in addition to the SOS button, which is an emergency button for seniors and children, which allows your loved ones to quickly and easily call for help in an emergency and you will be informed immediately by an alarm notification. With the voice messages, you can send information such as that you are on your way to your child or elderly relatives, or that your child can tell you that he or she needs help.
NO DISTANCE LIMIT: With the PAJ GPS person tracker, there is no distance limit, so you can always keep an eye on your children or elderly relatives no matter where they are.
LONG BATTERY LIFE: The GPS transmitter for seniors and children offers a battery life of about 14 days, so you don't have to worry about the battery draining quickly.
SUBSCRIPTION: Includes a SIM card and offers a lifelong device replacement, along with 24/7 customer support in multiple languages. Control your locators with our free app compatible with Android and iOS and share it with the whole family. Choose between the Premium or Basic plans, with options from monthly to every 2 years, from $5.50 per month, with payment frequency depending on the duration of the subscription. See pricing details in the images.
13 reviews for PAJ GPS Easy Finder 4G – GPS Tracker for Kids, Seniors/Elderly & Loved Ones – Real-Time Location Tracker Device, SOS/Emergency Button, Voice Messages, Up to 14 Days Battery – Subscription Required
Add a review Cancel reply
Related Products
BIGGERFIVE Vigor Kids Fitness Tracker for Girls & Boys Ages 5-15, Kids Watch with IP68 Waterproof, Pedometer, Activity Tracker with Heart Rate & Sleep Monitor, Calorie & Step Counter Watch
Smart Watch Fitness Tracker with 24/7 Heart Rate, Blood Oxygen Blood Pressure Monitor Sleep Tracker 120 Sports Modes Activity Trackers Step Calorie Counter IP68 Waterproof for Andriod iPhone Women Men


Kieshan –
Dad’s tracker
Love this , but if they could make it a little smaller. I love the fact that my dad cant break it. And he has tried. We got this for him because he would walk away from the house because he has dementia. It gives me step by step routes for him. It’s very easy to use. On time tracking, and gives very detailed data. Great price and has the best plans for subscription. Just wished it could have been smaller. If I could just could keep him from taking it off.
Robert A Farley –
Accurate with long battery life.
Excellent GPS tracker. Very accurate in real time. Great for luggage. Could be used in a vehicle. PAJ stands behind their products. I had a different model car tracker that went bad and the replaced it immediately.
KL –
Good GPS tracker, map design can be improved
I used this GPS to track my car as it was shipped across state lines. Overall – it was very accurate and accomplished it’s intended purpose. Subtracted a star for the quality of the maps on the app. I do feel if it utilized something like google maps, it would be much more user friendly. The current map UI looks very outdated and not very intuitive.
GSD owner –
Great value
The app takes a bit to get used to but it’s accurate and well worth the money. We got this for our son’s book bag (it’s a bit big to put somewhere on his person) so we know where he is on the bus to and from school. Angel Sense was too expensive every month and offered more features than we needed anyway. Definitely recommend the PAJ people finder.
F350 –
Rugged, reliable tracking at a reasonable price.
I have owned PAJ trackers before but the addition of 4G inputs significantly increases the tracking accuracy. This unit is slightly larger than my original tracker but battery life and functionality are greatly improved. There is no real “setup” involved. You only need to charge the unit, buy a plan that fits your needs, and download the app. Could not be easier. Rugged, reliable tracking at a reasonable price.
Raymond roberts –
Battery issue
Great product but battery life is only lasting one day when it said 5 days
Kat –
Must have for kids on the bus
I bought this to be able to track where my child is when he leaves for school on the bus. The tracker is accurate and easy to understand. Shows you the path they took and has immediate tracking. Also notifies you every time the gps tracker is moved, dropped, etc. You can set a speed alert to be notified if they go above a specific speed limit. Battery lasts for about 2 weeks in one charge.I popped this gps in my son’s backpack and follow on the app until he’s at school or back home with me.I highly recommend this.
Ty Gammill –
Need a subscription. Was not aware.
Requires a subscription. Now I can’t return.
Rete –
Buen producto con un precio muy asequible, (50€ con oferta del 50% de dto) he revisado muchos otros modelos y este es el que mejores características tiene.Antes de la compra contacté telefónicamente con el vendedor para comentar unas dudas que me aclararon perfectamente.Esto que parece fácil ha sido imposible de conseguir con otros vendedores ya que no me han respondido al correo / teléfono y el que lo ha hecho ha sido pasado un tiempo.Lo importante de estos aparatos es que tengan un mantenimiento de servidor que impida que se caiga ya sea por problemas técnicos o por que la empresa cierra (esta situación la he sufrido y te quedas con un bonito aparato de 300€ que no te vale para nada), en este caso hay que pagar un mantenimiento mensual de 4,99€.A destacar del Allaround Finder de PAJ que no sólo te posiciona en un plano y te muestra el recorrido (vía web o app) sino que además te proporciona diferentes funciones muy importantes como : alarma de exceso de velocidad, alarma SOS, alarma de área, alarma de movimiento.La posición es bastante exacta y la batería dura 20 días.Como único pero sería que es un poco grande 106×63×22mm y 140 gramos (como un móvil más o menos)Totalmente recomendable su compra.
Morkecho –
Excelente producto, cumple con las funciones especificadas, hay que contratar el servicio , puede ser mensual, o por 1 año , no es muy caro , trae botón de emergencia , muy recomendable si lo ocupan para personas mayores, niños si no traen celular o bien vehículos
Kara –
This is a fantastic gps tracker!I have an autistic, non verbal son who likes to elope and I had been searching everywhere for a reliable and affordable option; I reached out to customer service and within an hour they had answered all my questions!The set up took a little bit, but once fully synced, it works like a charm. You can expand the circle radius so that it tracks incredible distances and with its built in Sim card, anywhere there is 4g tower access it pings off of for quick results and great accuracy, updating every 10 seconds unlike other products where it needs to be within phone/Bluetooth range.Now it is a little larger, but can still be hidden in zipper pockets for more discreet tracking if necessary. I’ve included a photo that matches it to similar size to a travel pack of kleenex. I purchased the premium 6 month plan and it came to a total of $87, which is again MUCH more affordable than other options on the market. The app is very versatile and customizable which is a bonus for me.All in all, absoultley a great product, with great customer service that’s worth every penny to keep my son safe. I highly recommend it! If I could give more than 5 stars, I would.
Mackenzie –
The PAJ tracker is a superb piece of kit, we bought one when it was recommended to us.The app takes a little getting used to, but once you have it’s plain sailing.You can send a message to your child which plays automatically. I did wonder, how does that help if it’s in their bag while they are nowhere near it? But I found out that when you send the message it won’t play until the device physically moves. So your child picks up their bag and hears your message.The tracking is pretty accurate, better than others I’ve seen. Our daughter loves being able to message us and ask for a lift home or can she go to the park etc.Peace of mind, it really is.There are many options to set, like warnings if your child moves over a certain speed. This is useful because it will alert you if they are unexpectedly inside a moving vehicle when you thought they would be walking.All in all, I heartily recommend this. The battery lasts a week no problem and charges quickly.
Codrut Vlad –
I can say that this GPS Tracker is perfect from all points of view. You can set and see a lot of information about location, speed, route… In a word, PAG tracker has them combined in one application and device and very easy to use. Very low price for the device and a very low and acceptable subscription for anyone’s budget. Thanks PAJ👍😀